The composition and function of AC charging pile

The composition and function of AC charging pile

It adopts wall-mounted installation method (floor-mounted installation is realized after the bracket is configured), and is mainly used in public buildings, residential area parking lots or charging stations. This product uses conductive charging to provide AC charging interfaces for electric vehicles. The product is installed outdoors. Waterproof and dustproof design, protection grade IP54, this product integrates charging interface, control unit, communication, billing and other components, adopts modular design, has the characteristics of convenient installation and debugging, simple operation and maintenance, etc.The single-gun AC charging pile is designed based on GB/T 20234.1-2015 and GB/T 20234.2-2015.Single-phase (1W+N+PE) AC power is connected to the charging system through three UK10N connectors. After being protected by a C-level lightning protector, the leakage protector is connected in series with the AC main circuit. After being protected by the leakage protector, the metering power is input. Watt-hour meter (optional for some configurations), after the AC output from the meter, it is input into the AC contactor, and the output side of the contactor is directly sent to the charging plug. The maximum output power of the AC charging pile is 7kWUnder normal circumstances, it works according to its predetermined parameters or user commands. The monitoring system can detect and control the working status of the entire charging pile, and user commands can be issued through the local setting interface, local PC software, and remote background. The electrical schematic diagram of the HPXIN 7kW single-plug AC charging pile is shown in the figure below.site preparation

Reserve the cables and communication cables in advance, then drill holes and pre-embed expansion bolts according to the drawings, and then move the charging pile to a fixed position and fix the equipment.Site Notes:

1.The single-gun AC charging pile should be installed on the center line of the installation location (or the center of the two parking spaces;

2.The venue needs to add protective facilities such as reflective strips or anti-collision fences;

3. Reserve nearby fire-fighting equipment (fire extinguishers or fire-fighting sand pools.

Related Posts

What is dynamic load balancing of EV charger?

What is dynamic load balancing of EV charger?

Dynamic load balancing(DLB for short) is a function that continuously monitors changes in electrical energy consumption in a load circuit and automatically allocates available capacity to different electrical devices. In the field of EV charging, dynamic load balancing is a technology applied to EV charging systems. The technology involves efficiently distributing available electricity based on […]

Read More
Why does LIACC choose PV connector as the wiring solution of AC EV chargers?

Why does LIACC choose PV connector as the wiring solution of AC EV chargers?

LIACC has been committed to exploring more efficient and safe wiring solutions for AC EV chargers. Through scientific structural design, the charging pile can be quickly connected to the power supply without opening the housing at the installation site, reducing the installation labor cost and saving the user’s installation cost. For the first generation of solutions, […]

Read More
We are coming! Liya New Energy Join the The eMove360° Europe 2023

We are coming! Liya New Energy Join the The eMove360° Europe 2023

The 7th International Trade Fair for Electric & Autonomous Mobility , Which is known as The trade fair eMove360° Europe 2023,  held on October 17 – 19, 2023 at the grounds of Messe Muenchen, entrance east,has kicked off with a resounding success.    (Booth product display pic.) It’s the leading B2B trade show for new mobility, […]

Read More